AM Study #1
01/02/2018
Just completed 14 months monitoring at 6 locations in West Cork for complaint investigation of AM and Low Freq noise from a large Wind Turbine site. Only B&K's Type 2250 SLM with remote comms would be capable of such a sustained programme!
AM Study #2
01/02/2018
Report just completed on analysis of data on a small Wind Turbine site in Northern Ireland. Using the IOA AMWG code, we were able to confirm the presence of AM. Our Ricardo's wizardry with Excel and statistical analysis drilled down into the correlation between AM and the turbine operations.
Another Wind Turbine
08/05/2018
Another successful Wind Turbine job - this time 7 locations, 2 met masts covering two separate adjacent sites - but we couldn't resist showing the lovely photo of the met mast installation.
BIG Wind Turbine assessment
17/07/2018
26 weeks, 13 locations - 8TB data!! Our biggest survey yet (and probably Ireland's) has just completed. 13 locations, 2 met masts, 26 weeks and over 8TB (yes, terra!) of data!! Now for the number cruching!
Construction Noise & Vibration
01/11/2016
Road construction on Blackhorse Ave needed quick deployment of a noise and vibration monitor. We installed within 24hrs and delivered report within a week. Client "Really impressed with the responsiveness and cost provided by Enfonic".
High Sensitivity Vibration
01/01/1970
In the course of two months, we've conducted three High Sensitivity Vibration analysis using our unique B&K solution. Applications were for wafer fabrication instrumentation and medical diagnostics devices.
Noise Impact Assessment
01/01/1970
Completed our second NIA for this client last year which has just been approved by planning. Noise assessment and prediction coupled with BS4142 impact assessment undertaken in less then 2 weeks.